Navigation

Send Us A Message

Submit

Pre-Insulated Seamless Carbon Steel Pipe
High-Quality Pre-Insulated Seamless Carbon Steel Pipe for Efficient Thermal Performance

The pre insulated pipe system is made up of steel carrier pipe, 100% CFC free polyurethane insulation foam and seamless solid wall HDPE jacket. Steel carrier pipe may vary according to project specification; from ERW (Electric resistance welded), SAW (Submerged arc welded) or Seamless pipes with wall thickness from Std, Sch 40, XS.
WhatsApp :+1 331-777-3038
Phone :+1 331-777-3038
Email :info@allico-intl.com

PRODUCT PARAMETERS


High-Quality Pre-Insulated Seamless Carbon Steel Pipe for Efficient Thermal Performance

The pre insulated pipe system is made up of steel carrier pipe, 100% CFC free polyurethane insulation foam and seamless solid wall HDPE jacket. Steel carrier pipe may vary according to project specification; from ERW (Electric resistance welded), SAW (Submerged arc welded) or Seamless pipes with wall thickness from Std, Sch 40, XS.

The insulation is made of 100% CFC free polyurethane foam. The required amount of foaming mixture, usually 25% over packed, is injected into the cavity between the steel core and the casing pipe via the injection hole in the metal end caps at the top of the pipe assembly. Air vent plugs are fitted on the metal end caps to dispense the air entrapped.

Thermal conductivity: In the range of 0.0230 to 0.0280 W/mK
Core density: 48 to 90 kg/m3 or as per customer requirement
Thickness: recommended 50mm or as per customer requirement
Compressive strength: 300 KPa (minimum)
Blowing agent: Water based, 141b, solstice (EN253 certification)
The outer casing or protective jacket shall be HDPE pipe, black, UV - resistant, having a minimum        density of 950 kg/m3
Outer casing diameter/wall thickness: As per EN253

FAQ

Q1. What is your terms of Packing?

A: Generally we pack your goods with Neutral English bag, PP Woven bag with PE inner bag. If you have your own legally registered sack design, we can pack your goods with your brand and design bags after getting your authorization letter.

Q2. What is your terms of payment?

A: Normally 30% TT as deposit in advance, and 70% TT after email the copy of BL. Or LC at sight. We'll show you the photos pf your goods and package before you arrange the payment.

Q3. What is your terms of delivery?

A: Normally we do FOB, CFR, CIF terms.

Q4. How about your delivery date?

A: Normally it will takes 10~15 days after receive the deposit. The specific delivery time depends on the items and the quantity of the order.

Q5. Can you produce according to the sample?

A: Yes, we can produce by your samples or the specification you provide.

CONTACT US

PRODUCT RECOMMENDATION